Részletek a könyvből
1 - 3 találat összesen 100 találatból.
12. oldal
Today there are eight different heights from the ground of door levels ranging from 6 ft 8 in for the BAC One - Eleven to 16 ft 5 in for the Concorde , and although this presents difficulties it is nothing like the problem presented by ...
Today there are eight different heights from the ground of door levels ranging from 6 ft 8 in for the BAC One - Eleven to 16 ft 5 in for the Concorde , and although this presents difficulties it is nothing like the problem presented by ...
7. oldal
The modification was withdrawn and reintroduced with a blade pin clearance change , which was effective in eliminating this problem . The Spey has never had any real bearing problems . Any failures that have occurred have been traced to ...
The modification was withdrawn and reintroduced with a blade pin clearance change , which was effective in eliminating this problem . The Spey has never had any real bearing problems . Any failures that have occurred have been traced to ...
11. oldal
The parking and ground transportation problems found at these airports are becoming increasingly apparent in major airports throughout the world . The problem became clear one recent day at a major inter- national airport .
The parking and ground transportation problems found at these airports are becoming increasingly apparent in major airports throughout the world . The problem became clear one recent day at a major inter- national airport .
Mit mondanak mások - Írjon ismertetőt
Nem találtunk ismertetőket a szokott helyeken.
Más kiadások - Összes megtekintése
Gyakori szavak és kifejezések
accident addition Air Transport aircraft airline Airport allow American application approach aviation Board Boeing British building cabin cargo carried carriers cent charter civil complete continued cost course cruise director engine equipment executive expected experience factor fares field flight flying four fuel further future Government ground improve increase industry interest International landing length Limited load London maintenance major mean ment miles months operations passengers payload performance pilot planning position possible present problem production programme range recent result route runway safety salary scheduled seats speed take-off technical tion traffic transport United week weight wing